论文部分内容阅读
在参加黄河桃花峪水庫的規划設計工作中,作者接触到黄河下游的反調节水庫問題,現将关于反調节水庫的任务、庫容的确定、庫容安排的原則和具体建議加以介紹,供作参考。一、黄河下游反調节水庫的任务 黃河三門峽及其下游的任家堆、八里胡同、小浪底、西霞院五个水电站,都将在第二个五年計划期中先后建成。其装机容量共为250万瓧左右。为了維持这些电站的正常发电,三門峽水庫在冬季需要經常泄放一定的流量。但此时下游两岸地区,除少量城市
In participating in the planning and design work of the Taohuayu reservoir in the Yellow River, the author came into contact with the problem of anti-regulation reservoirs in the lower reaches of the Yellow River. Presently, the tasks and capacities of anti-regulation reservoirs, the principle of concrete storage arrangements and concrete proposals are introduced for reference. First, the task of the anti-regulation reservoirs in the lower reaches of the Yellow River Sanmenxia Yellow River and its downstream Ren Jia Dui, Bali Hutong, Xiaolangdi, Xixia Hospital five hydropower stations, will be completed in the second five-year plan period. Its installed capacity is about 2.5 million 瓧. In order to maintain the normal power generation of these plants, the Sanmenxia Reservoir needs to regularly discharge a certain amount of flow in winter. But at this time the lower reaches of the Taiwan Strait, with the exception of a small number of cities