河北奥体中心项目,建筑体量大、屋面为大跨度钢结构网架,结构形式复杂、机电管线繁多、设备机房狭小、碰撞问题较多,传统的设计方法在处理机电管线综合、机房优化、大跨度钢结构设计方面的缺陷和不足逐渐显现。BIM技术作为实现建筑业转型升级的新型技术,是解决复杂项目设计的有效工具。该项目在施工过程中应用BIM技术,实现了设计的三维可视化,在机电管线综合,设备机房综合排布,钢结构网架安装等方面对设计进行优化,减少返工率,缩短工期,提高了图纸和工程的质量。
Hebei Olympic Sports Center project, the construction volume is large, the roof is a large-span steel truss, the structure is complex, the electromechanical pipeline is numerous, the equipment room is small and the collision problem is more. The traditional design method is to deal with the integration of electromechanical pipeline, engine room optimization, The shortcomings and shortcomings in the design of long-span steel structures gradually appear. BIM technology as a new technology to achieve transformation and upgrading of the construction industry is an effective tool to solve complex project design. The project uses BIM technology in the construction process to achieve the three-dimensional visualization of the design, optimize the design in terms of the integration of the mechanical and electrical pipeline, the comprehensive arrangement of the equipment room and the installation of the steel structure grid, reduce the rework rate, shorten the construction period, and improve the drawing And the quality of the project.