论文部分内容阅读
The LPT (Lanzhou Penning Trap) is under construction and its task is to perform direct mass measurement of fusion-evaporation residues and if possible for heavy isotopes. Detailed simulations have been done for a good understanding to the ion's movement and mechanics in the trap. The optimization of the LPT is also performed based on the simulation. With a scale of 0.5 mm per grid used in the simulation and many other limitations a highest mass resolution has been achieved to be 1.9×10-5. An unexpected behaviour in the simulation related to magnetron motion has been found.
The LPT (Lanzhou Penning Trap) is under construction and its task is to perform direct mass measurement of fusion-evaporating residues and if possible for heavy isotopes. Detailed simulations have been done for a good understanding to the ion's movement and mechanics in the trap. The optimization of the LPT is also performed based on the simulation. With a scale of 0.5 mm per grid used in the simulation and many other limitations a highest mass resolution has been to 1.9 × 10-5. An unexpected behavior in the simulation related to magnetron motion has been found.