水轮发电机组在安装完毕后,必须进行盘车工序来检查机组轴线,继而进行处理达到规范的要求,以便确定上、下、水导瓦间隙的配合,保证机组的安全运行。所以机组轴线检查和处理的工作乃机组安装关键之一由于重复处理所占用的主工期,一般在5天以上,甚至达半月之久,如何在保证质量的基础上,缩短本工序的工期,以取得最佳效益。为此针对传统的处理工艺和设备的
After the installation of hydro-generator set, it is necessary to carry out the turning process to check the unit axis, and then to meet the regulatory requirements in order to determine the upper, lower, water guide tile clearance with the cooperation to ensure the safe operation of the unit. Therefore, the work of checking and handling the unit axis is one of the keys of the unit installation. Due to the main processing period occupied by the repeated processing, it usually takes more than 5 days or even up to half a month. How to shorten the duration of this process based on the quality assurance Get the best benefit To this end for the traditional processing technology and equipment