中国实验快堆(简称实验快堆,CEFR),热功率65 MW,试验发电功率20 MW,首炉燃料使用UO2,采用堆本体池式结构和钠-钠-水三回路热传输系统,并首次独立设立非能动事故余热排出系统。2011年7月,实验快堆实现40%功率稳定发电24 h,完成了国家要求的验收目标。2013年的主要工作包括按《国防科技工业固定资产投资项目竣工验收实施细则》要求开展各单项的竣工验收工作和反应堆的定期试验、维护保养、预防性维修及纠正性维修工作,以及二、三炉燃料国际采购的相关工作。
China Experimental Fast Reactor (CEFR), thermal power 65 MW, test power 20 MW, UO2 for the first furnace fuel, heap-body pool structure and sodium-sodium-water three-loop heat transfer system, Independent non-active accidental waste heat exhaust system. In July 2011, the experimental fast reactor achieved a power generation of 40% with stable power generation for 24 hours, fulfilling the acceptance target required by the country. The main tasks in 2013 include carrying out the individual completion and acceptance work and regular reactor tests, maintenance, preventive maintenance and corrective maintenance work as required by the “Implementation Rules for the Final Acceptance of Investment Projects in Fixed Assets of the National Defense Science and Technology Industry” Furnace fuel international procurement related work.