准格尔煤矿黑岱沟露天煤矿群仓施工中,为解决空心仓壁的施工问题,采用了空心竖壁滑模液压竖向自动抽孔工艺,即在常规滑模工艺基础上,只需在混凝土竖壁的常规滑模套槽之间,增设与空心壁相适应的液压竖向抽孔装置,与滑模提升架通过附加环梁相连系,构成液压抽孔系统,使抽孔与竖壁滑模得以同步等速完成。采用该工艺,取得了良好的效果。
During the construction of the Heigougou open-pit coal mine in the Zhunge’er Coal Mine, in order to solve the construction problem of the hollow silo wall, a vertical hydraulic vertical hole drawing technology for the hollow vertical wall sliding mode was adopted, that is, on the basis of the conventional sliding mode technology, only A vertical hydraulic pumping hole device adapted to the hollow wall is added between the conventional sliding mold sleeve grooves of the vertical wall of the concrete, and the sliding mold lifting frame is connected by an additional ring beam to form a hydraulic pumping hole system to make the pumping holes and vertical walls Sliding mode is completed synchronously and at equal speed. Using this process, good results have been achieved.