[问]接触的加气块墙体抹灰施工不多,以前做过一个,采用墙与柱梁交接处挂钢丝网,但效果不好。现在第二个工程正准备进行加气块墙体抹灰,公司内有两种施工方案:一种是全部墙体挂钢丝网,然后抹灰;另一种是墙与柱梁交接处挂钢丝网,用素水泥浆掺入108胶水,随刷随抹灰。您认为哪种方案更能保证工程质量呢?
[Q] Contact aerated block wall plastering less construction, previously done one, using the wall and column beam junction hanging wire mesh, but the effect is not good. The second project is now ready for aerated block wall plastering, the company has two construction programs: one is all the walls hanging wire mesh, and then plastering; the other is the wall and the column beam junction hanging wire Mesh, prime grout mixed with 108 glue, with the brush with the plaster. What kind of solution do you think can guarantee the quality of the project?