本文提出并遵循湿拌砂浆开放时间的新概念,利用混凝土搅拌站的原有生产平台及物流装备,采用创新的减水剂与调节剂双掺工艺,按创新的“三步法”设计砂浆配合比,生产得到的湿拌砂浆符合国家标准的要求,实现了湿拌砂浆集中生产、集中配送,解决了湿拌砂浆单次配送量小、配送频繁的难题,满足工地现取现用、不用不硬、即用即硬的要求。大幅降低工地使用预拌砂浆的综合成本;提出并遵循抹灰工程“三零体系”的要求,实现砂浆抹灰层零空鼓、零开裂、零渗漏的工程目标。为预拌砂浆的推广及商品混凝土企业产业升级提供新的参考思路。
This paper puts forward and follows the new concept of wet-mixing mortar open time, using the original production platform and logistics equipment of concrete mixing plant, adopting the innovative double-doping process of water reducer and regulator, according to the innovative “three-step method” design Mortar mix, the production of wet mortar meet the requirements of national standards, to achieve a centralized wet production of wet mortar, centralized distribution, to solve a single batch delivery of wet mixed mortar small, frequent distribution problems to meet the site is now available, do not have Not hard, that is hard to use requirements. Drastically reduce the overall cost of using ready-mixed mortar in the construction site; put forward and follow the requirements of “plastering project” and “three systems” to achieve the engineering goal of mortar plastering layer with zero-emptying, zero cracking and zero leakage. It provides a new reference for the promotion of ready-mixed mortar and industrial upgrading of commercial concrete enterprises.