论文部分内容阅读
目前,公司档案系统保存了约2万余册工程竣工档案,档案馆保存有1.3万多册。企业竣工图档案是生产管理和技术改造中经常需要查阅的内容,它应该保持完整、准确,才能成为生产管理和技术改造可靠的依据。一、工程竣工图档案中确实存在图物不符的现象。调查中,一位工程处的同志说,他们施工前查阅了图纸,在某某位置下没有管道,但挖开地面后,发现下面有管子,只能改道开挖。是什么原因造成这种图物不相符的现象呢?调查得知目前主要有四方面因素造成。第一,原装置经过了技术改造,但原图纸没有进行相应的改动,如果查阅了老图纸,就与现实状况不符。第二,工程项目竣工时,施工单位交来的
At present, the company archives system has saved about 2 million project completion archives, and the archives preserved over 13,000 volumes. Enterprise plans file is the production management and technical transformation often need to access the content, it should be kept intact and accurate, in order to become a reliable basis for production management and technological transformation. First, the project completed the file does not match the picture does exist phenomenon. During the investigation, a staff member of the Agency said that they consulted the drawings prior to construction and did not have any pipelines at certain locations. However, after digging the ground, they found pipes below and could only divert them. What causes this phenomenon does not match the phenomenon? The survey found that there are mainly four factors. First, the original installation has undergone technological transformation, but the original drawing has not been changed accordingly. If the old drawing is consulted, it will not conform with the actual situation. Second, when the construction project is completed, the construction unit will hand over it