在船体建造过程中,当角接接头间隙超差,并超过5 mm时,可采用割换、垫板和堆焊等三种方法处理(如图1所示)。这三种超
During the construction of the hull, when the clearance of the corner joint is out of tolerance and exceeds 5 mm, three methods of cutover, backing plate and surfacing are available (as shown in Figure 1). These three super