1.梅山选厂铁精矿过滤的现状梅山选厂在1979年10月试车以后才发现铁精矿过滤非常困难,因此在试生产期间缺乏技术措施上的准备。1980年采用φ125水力旋流器把过滤机的溢流脱去一部分矿泥,开始时矿泥量占铁精矿量的6~7%,由于管理未跟上,脱泥量逐渐增大至20%,这些矿泥含铁量为43%左右,烧损量约为16~19%,
1. Meishan Iron Concentrate Filtration Plant Separation Plant Meishan dressing plant in October 1979 after the trial found that the iron concentrate filtration is very difficult, so the lack of technical measures during the trial production preparation. In 1980, the φ125 hydrocyclone was used to remove part of the slime from the overflow of the filter. At the beginning, the amount of slime accounted for 6 ~ 7% of the amount of iron concentrate. Since the management did not keep up, the amount of slime removal gradually increased to 20 % Of these ore slime iron content of about 43%, burning about 16 ~ 19%