1980年6月2~4日,法国高炉会议在马赛附近的阿尔(Arles)召开,300余人出席,其中邀请32个国家与地区近200人参加。在会上宣读论文24篇,印成文集共56篇。论文分高炉装料问题、能源、气体与液体流物理化学现象、现场经验、原料与高炉操作的控制等五部分。这次会议的主题可概括为高炉炉料分布与煤气分布的控制——可调炉喉与无钟炉顶的试验研究与操作经验。会后组织参观福斯钢铁厂与敦克尔刻钢铁厂。二厂一南一北,都是新建的临海钢厂。几座高炉均装备新的检测仪表与电子计算机,生产指标先进
From June 2-4, 1980, the French blast furnace meeting was held in Arles near Marseille. More than 300 people attended the blast furnace meeting, of which nearly 200 were invited from 32 countries and regions. 24 papers were read at the conference and 56 papers were printed. The dissertation is divided into five parts: charge of blast furnace, physical and chemical phenomenon of energy, gas and liquid flow, field experience, operation of raw materials and blast furnace. The theme of this meeting can be summarized as the control of blast furnace charge distribution and gas distribution - experimental research and operation experience of adjustable throat and bellless top. After the meeting, we visited Foss Steel Factory and Dunkirk Steel Factory. Plant a South a North, are the new Linhai steel mills. Several blast furnaces are equipped with new testing instruments and electronic computers, advanced production indicators