论文部分内容阅读
江西省萍乡市化肥厂前几年先后安装了两台蒸发量分别为8吨/时和10吨/时的全沸腾型锅炉,拟燃用厂区附近煤矿的煤矸石和厂内的造气炉炉渣。由于对这类新型锅炉缺乏使用经验,再加上锅炉原设计上的某些不足,在试烧过程中需在煤矸石中掺入60%的优质烟煤才能燃用,而且常出现点火、压火困难,容易结焦黑火等情况。致使汽量不足,压力波动大,甚至停车。
Pingxiang City, Jiangxi Province, a few years ago the fertilizer plant has installed two evaporation were 8 tons / hour and 10 tons / hour full boil-type boilers, coal mines to be used near the plant and the factory gas furnace slag . Due to the lack of experience in the use of such new boilers, coupled with some of the original design of the boiler inadequate, in the test burning process in the coal gangue need to incorporate 60% of high-quality bituminous coal to burn, and often appear ignition, pressure fire Difficulties, easy to coke black fire and so on. Resulting in insufficient steam volume, pressure fluctuations, and even parking.