尖山铁矿由采区下来的矿石经过溜井运输至斜井底部,再经过长距离大功率爬坡胶带运至破碎区域,该运输胶带的提升高度超过400 m,功率为1 450×3 k W,胶带长度2 400 m。这样长距离的爬坡胶带运行中一旦发生事故,就会造成巨大损失。为了胶带的安全运行,公司在原设计的基础上对胶带的控制方式进行了优化,并取得了很好的效果。
Jianshan Iron Mine is transported to the bottom of inclined shaft through the chute and then transported to the broken area through long-distance high-power climbing slope belt. The lifting height of the transportation belt exceeds 400 m and the power is 1 450 × 3 k W, Tape length 2400 m. Such long-distance climbing tape operation in the event of an accident, it will cause huge losses. For the safe operation of the tape, the company in the original design based on the control of the tape has been optimized, and achieved good results.