论文部分内容阅读
酒钢1513m~3高炉的装料制度经历了由单环布料到分装多环布料,再到同装多环布料的演变过程。随着装料制度的变化,高炉顺行状况和技术经济指标不断改善。
Jiuquan Iron and Steel 1513m ~ 3 blast furnace loading system has gone through from single-ring fabric to sub-multi-ring fabric distribution, to the same multi-ring fabric with the evolution process. With the change of loading system, the smooth progress of the blast furnace and technical and economic indicators have been continuously improved.