结合井田坝大桥灾后恢复重建工程,针对该工程抗震要求高,周边环境复杂、施工工期紧等特点和施工中存在的受水库水位影响大等难点,展开桥梁设计和施工的比对研究,通过计算验证设计的可靠性,并针对工程中的实际问题提出合理的解决办法。
Combining with the reconstruction of the Tianjingba Bridge disaster recovery project, aiming at the difficulties such as high seismic resistance requirements, complex surrounding environment, tight construction period and the influence of reservoir water level during the construction, the comparison and research on bridge design and construction are carried out. Through calculation Verify the reliability of the design, and propose a reasonable solution to the actual problems in the project.