“龙滩水电站技术讨论会”于1983年3月16日至27日在广西南宁召开。参加这次会议的有水电总局、水电部基建司、北科院、南科所、清华大学、华东水院等36个单位的代表共120名。会议由中南院副院长安申义同志主持。龙滩水电站是广西红水河十个梯级中起控制性的大型骨干工程,是红水河水能资源富矿中的宝中之宝。计划装机400万千瓦至600万千瓦,坝高为220米至265米,该工程坝高、库
“Longtan Hydropower Station Technical Seminar” was held in Nanning, Guangxi from March 16 to March 27, 1983. A total of 120 delegates attended the meeting from 36 units, including General Administration of Hydroelectricity, Ministry of Infrastructure Construction, Ministry of Electric Power, North Branch, South Branch, Tsinghua University and East China Water Institute. The meeting was presided over by Assoc. Dean Anshen Yi, chairman of the Central South Institute. Longtan Hydropower Station is a large-scale backbone project controlled by 10 steps of Guangxi Hongshui River. It is the treasure of Hongshuihe water resources rich ore. It is planned to install 4 million kilowatts to 6 million kilowatts, the dam height is 220 meters to 265 meters, the project dam height, library