论文部分内容阅读
矿山设计的最终目的是采用1个或多个方案确定有关的开发工作和所需的资源。此过程的一部分是编制采矿生产计划或设计以及预测所期望的收益。目的是利用编制的计算机模型验证矿山设计的各个方面。对于连续的矿体,利用这些模型能够对1个或多个采场进行设计和经济分析。
The ultimate goal of mine design is to use one or more options to identify the development work and resources required. Part of this process is the preparation of the mining production plan or design and the forecast of the expected benefits. The purpose is to validate all aspects of mine design using a computerized model. For continuous ore bodies, these models enable the design and economic analysis of one or more stopes.