当前世界经济全面进入后金融危机时代,由于维系到宏观经济命脉,石油石化企业的发展成败在很大程度上决定了一个国家经济运行的兴衰。“设计——采购——施工”三位一体运作的EPC模式在石化工程中广为使用,在分析石化工程总承包项目物资供应各阶段资源管理重点以及各种风险的基础上,本文针对性地提出了完善激励与约束机制、加强内部管理等对策建议。
Since the world economy has entered the post-financial crisis era in an all-round way, the success or failure of petroleum and petrochemical enterprises largely determines the rise and fall of the economic operation of a country due to its maintenance of the macro-economic lifeline. “Design - Procurement - Construction ” Trinity EPC mode is widely used in petrochemical projects. On the basis of analyzing the key points and various risks of resource management in each stage of material supply of EPC projects, Proposed to improve the incentive and restraint mechanisms to strengthen internal management and other countermeasures.