论文部分内容阅读
随着港口不断向大型化、专业化、自动化方向发展,与之配套的机电设备也获得了较大的改造与发展,无论从质量还是功能方面都有所改进与提升。然而,很多优质的机电设备未能达到使用寿命,或没有充分发挥应有作用,很大程度上与安装调试有关。因此,提高码头机电设备安装质量,采用科学的技术措施进行安装、调试具有非凡的意义。本文针对某港口机电设备安装与调试展开讨论,分析了港口机电设备安装的影响因素以及具体的安装质量控制措施与安装过程。
As the port continues to grow in size, specialization and automation, its associated mechanical and electrical equipment has also been greatly reformed and developed, both in terms of quality and function, and has been improved and upgraded. However, many high-quality mechanical and electrical equipment failed to reach the service life, or did not play its due role, to a large extent, with the installation and commissioning. Therefore, it is of extraordinary significance to improve the installation quality of terminal electromechanical equipment and adopt scientific technical measures for installation and commissioning. This paper discusses the installation and commissioning of a mechanical and electrical equipment in a port, analyzes the factors that affect the installation of mechanical and electrical equipment in the port, as well as the specific installation quality control measures and installation process.