论文部分内容阅读
呼铁局基建处自1970年至1975年在包兰线先后用环氧树脂及环氧玻璃布补漏水塔三座,其中有阿吉拉车站300吨钢筋混凝土水塔,白彦花车站120吨钢丝网水塔及五原车站120吨钢筋混凝土水塔,经数年使用情况良好。
From 1970 to 1975, the Infrastructure Department of the Hutie Bureau made three leakproof towers with epoxy resin and epoxy glass cloth on the Baolan Line. Among them were 300 tons of reinforced concrete towers at Aguila station and 120 tons of steel towers at Baiyanhua station. The 120-ton reinforced concrete water tower at Wuyuan Station has been used well for several years.