论文部分内容阅读
目前,我国锰铁高炉多用贫矿冶炼,因而渣量大,焦比高.为寻找锰铁高炉节能降焦的方向,我们于1983年3月对重钢四厂锰铁高炉(100米~3)进行了热平衡测定.用热平衡测定及计算结果研究锰铁高炉能量利用特征,找出降低焦比的方向,挖掘节能的潜力. 一、热平衡测定及计算结果热平衡测定及计算结果列于表1.为了
At present, China’s ferromanganese blast furnace multi-purpose lean ore smelting, so a large amount of slag, high coke ratio.In order to find the direction of energy saving of the ferromanganese blast furnace, we in March 1983 on the Chongqing Iron and Steel Plant ferromanganese blast furnace (100-3 ) Heat balance measurement and calculation results using heat balance of ferromanganese blast furnace energy utilization characteristics to find out the direction to reduce the coke ratio and tap the potential of energy conservation.A heat balance measurement and calculation results Heat balance measurement and calculation results are shown in Table 1. in order to