平顶山矿务局矸石电厂第一期工程1988年1月份兴建,设计装机容量12MW,装两台6MW凝汽式汽轮发电机组,原计划在1991年底建成投产。为加快工程施工进度,向党70周年献礼,今
The first phase of the Pingdingshan Mining Bureau gangue power plant was constructed in January 1988 with a designed installed capacity of 12MW and two 6MW condensing steam turbine generators. The original plan was put into operation by the end of 1991. To speed up the progress of construction, to the 70th anniversary of the gift, today