论文部分内容阅读
文章重点介绍西客站铁路北站房建筑方案及预埋地铁工程,地铁车站设计。西客站是北京90年代三大重点工程之一,它由西站地区、客车技术作业站二部分组成。西站地区包括铁路南北站房、铁路高架候车室及站场设施、预埋地铁工程、市政配套工程及附属工程等。西客站预埋地铁工程全长513m,包括区间、车站及折返线,它将在莲花河盖板河、铁路南站房、行包通道,高架候车室及场区铁路股道等工程下穿过,采用明挖法施工,基坑开挖最大深度为地面下17m,地铁车站总建筑面积30 550m~2,是目前北京西单地铁车站的2.35倍。
The article focuses on West Railway Station Railway North Station room building programs and embedded subway project, metro station design. The West Railway Station is one of the three key projects of Beijing in the 1990s. It consists of two parts: the West Railway Station Area and the Bus Technology Operations Station. West Railway Station area including South and North Railway Station room, railway waiting room and station elevated elevated facilities, subway engineering, municipal supporting projects and ancillary works. The total length of the metro project embarked into the West Railway Station is 513m, including the interval, station and return line. It will pass under projects such as the Lianhuahe River, the South Railway Station Building, the luggage passage, the elevated waiting room and the railroad track in the field area , The use of open-cut construction, excavation maximum depth of 17m under the ground, the total construction area of 30 550m ~ 2 metro station, which is 2.35 times the Beijing Xidan subway station.