经过一次换水周期的连续池水监测,表明采用机械循环过滤池水COD含量低于人工沉淀吸污方法,二种净化方法COD含量比较有显著区别,P<0.05。单纯采用液氯消毒池水pH值偏酸性,均值为5.85,与采用漂白粉消毒的池水pH值比较差异非常显著,P<0.01。开放后两池水均受到CHCl_3污染,最高检出值分别为92.8μg/L和172.8μg/L,CHCl_3污染与池水使用时间、池水耗氧量均呈正相关。 After a continuous cycle of water exchange monitoring of the water cycle, indicating that the use of mechanical circulation filter tank water COD content was lower than the manual sedimentation method, two kinds of purification methods COD content was significantly different, P <0.05. The pure pH value of the liquid chlorine disinfection tank was slightly acidic, with a mean value of 5.85, which was significantly different from that of the bleached water (P <0.01). After the opening, both of the two ponds were contaminated by CHCl_3, with the highest detections of 92.8 μg / L and 172.8 μg / L, respectively. The CHCl_3 pollution was positively correlated with the time of using the pond water and the oxygen consumption of the pond water.
其他文献
  根据大坝监测数据进行分析是大坝运行状况的一个重要方面。为评估大坝运行状况,应对大坝的各种数据进行技术监测。监测值受大坝类型、参数类型以及外部物理变量变化方位的
会议
  三板溪水电站大坝为混凝土面板堆石坝,最大坝高185.50m,是世界上首座采用复杂岩性材料修建的200m级高堆石坝,坝体填筑料中既有特坚硬岩,又有强度较低的强风化岩.2007年7
  2006年秋,鲁布革公司冶勒项目部通过对冶勒水电站压力钢管分岔部位的围岩渗透水压力、钢板应力、钢管混凝土衬砌与围岩之间缝隙等异常变化原因的分析,结合巡视检查中发现地
  首先对面板坝坡面垫层料施工新技术进行试验研究,经过分析论证,推出移动边墙新施工工艺,在此研究成果的基础上,新疆察汗乌苏水电站混凝土面板堆石坝垫层料的施工中采用了该技
  巴贡水电站是当前东南亚地区最大的水电站,枢纽工程主要由混凝土面板堆石坝、左岸引水式发电厂房、溢洪道和放水洞四大部分组成。面板堆石坝最大坝高205m,BAKUN大坝安全
会议
  通过分析砾质粘土心墙填筑体全料和细料压实度指标的检测方法,编制配合三点击实法计算填筑体压实度的Excel表格,笔者指出:砾质土料填筑体粒径小于20mm细料压实度指标可以通
  本文根据马来西亚巴贡电站堆石坝面板的施工,重点阐述了滑模的施工工艺、挤压墙表面乳化沥青施工技术、止水施工技术、高温条件下混凝土质量控制技术等,希望与同行共同探索
  混凝土面板是面板堆石坝的主要防渗结构,在面板堆石坝工程中占有重要地位。但面板堆石坝是“经验”坝,面板分缝、分块是根据工程地质条件参照工程经验或有限元计算确定的。
会议
  本文介绍了增大土石坝心墙填筑厚度的实验研究结果,并提出了一种合理化的心墙材料压实质量控制方法.20世纪90年代中期以前,在日本的土石坝心墙施工中,大多采用20cm的最终厚
会议
  墨西哥El Cajón坝拥有高188m的混凝土面板堆石坝。该坝设计方面进行了广泛的调查工作,详见文献。关于其完工后性态的补充数据说明实用的方案加上优良的理论设计可获得良