1 概述度汛应急工程由于时间紧,只进行技施设计,技施设计经海委审查批准后,马上进入建设实施阶段,而且要在主汛期前发挥效益,以确保汛期防洪安全。资金有特大防汛费的性质,建设过程参照基建,投资要确保不能突破概算,这就要求设计和造价管理者要拿出优秀的设计成果和切实可行概算,以满足工程防洪功能和概算的可行性。漳卫南运河系“96.8”洪水后,海
1 Overview Due to the tight schedule, the flood emergency project only carries out the technical design. After the technical design has been examined and approved by the IOC, it immediately enters the construction and implementation stage, and benefits are to be made before the main flood season to ensure the flood control safety. Funds have extraordinary nature of flood control fees, the construction process with reference to infrastructure, investment must ensure that the budget can not be exceeded, which requires design and cost managers to come up with excellent design results and practical estimates to meet the project flood control function and feasibility of the proposed budget . Zhang Wei South Canal Department “96.8 ” After the flood, the sea