论文部分内容阅读
1 工程概况由中国葛洲坝集团公司承包实施的泰国曼谷第六水厂扩建工程项目下的 MAHA SAWAT水厂二期输水泵站施工合同,是葛洲坝集团公司在东南亚实施的第一个工程,工程的业主是曼谷京都水署(以下简称 MWA),合同总金额为394.28万美元加上5848.75万泰铢(含3500万泰铢备用金)。资金主要由日本海外协力基金(OECF)提供,合同工期为720天,工程主要
1 PROJECT OVERVIEW The construction contract of the second stage water pumping station of MAHA SAWAT Waterworks under the extension of the sixth waterworks project in Bangkok, Thailand, which is contracted by China Gezhouba Group Co., Ltd., is the first project of Gezhouba Dam Group in Southeast Asia. The project The owner is Bangkok, Kyoto Water Department (hereinafter referred to as MWA), the total contract amount of 394.28 million and 58487500 baht (including 350000000 baht reserve). Funding is mainly provided by the Japan Overseas Cooperation Fund (OECF), the contract duration is 720 days, the main project