全国第一个输胶管道工程于2001年9月在云南橄榄坝农场问世,至今历时2年零2个月,替代人力输送胶乳550吨,大大降低了工人的劳动强度。 西双版纳山多平地少,挑胶难的问题,长期困扰着这里的割胶工人。橄榄坝农场七分场一队一号林地,当地人称营部大山,海拔830米,相对高度350米,坡陡50度,种植358亩橡胶林,有35个胶工在这里割胶。有人计算过,从山底的收胶点到山顶的树位,往返需要
The first pipeline project in the country came into being at Olive Dam Farm in Yunnan Province in September 2001. It lasted two years and two months and took the place of 550 tons of rubber latex instead of manpower, greatly reducing the labor intensity of workers. Xishuangbanna mountain more flat and less difficult to pick the problem, long troubled here tapping workers. Olive Dam Farm seven teams a team of a woodland, the locals said Camp Camp Hill, 830 meters above sea level, a relative height of 350 meters, steep slope 50 degrees, planted 358 acres of rubber plantation, 35 plastic workers tapping here. Some people have calculated, from the bottom of the plastic income to the top of the tree bit, and from the need