论文部分内容阅读
一、工程概况该工程位于济南市泉城路,是一座大型商业综合体建筑。始建于1996年,于2011年进行改扩建。在正常营业的情况下,对该建筑成功地进行了楼层整体置换以及整体改扩建等功能性提升改造,改造后总建筑面积13.4万m~2,其中改扩建部分建筑面积7.7万m~2,拆改规模居国内前列。楼层整体置换后原有建筑底部4层净空提高了30%,新旧建筑实现了无缝刚性连接,建筑的整体使用功能得到了显
First, the project profile The project is located in Quancheng Road, Jinan City, is a large commercial complex. Founded in 1996, in 2011 for expansion. Under the condition of normal operation, the building has successfully carried out functional upgrading and transformation such as overall floor replacement and overall renovation and expansion. After the renovation, the total construction area is 134,000m2, of which the reconstruction and expansion area covers an area of 77,000m2, Demolition of the largest domestic development in the forefront. After the replacement of the whole floor, the clearance of the fourth floor at the bottom of the original building has been increased by 30%. The old and new buildings have achieved seamless rigid connection, and the overall use of the building has been significantly enhanced