沈阳市炼焦煤气厂输气车间的操作室主要是控制和监视鼓风机的运行状况,位于二层楼上。由于罗茨鼓风机位于二楼,并且基础构件与二层楼板相连,原来的操作室是一个用砖砌在二层楼板上的小屋,墙体厚度为240mm,水泥刷石罩面,通风条件较差。由于操作室的墙体直接与二楼地面相连,无法有效地消除振动及固体传声的影响,因此其
Coking coal gas plant in Shenyang operation room gas transmission plant is mainly to control and monitor the operation of the blower, located on the second floor. Since the Roots blower is located on the second floor and the foundation is connected to a two-story floor, the original operator’s room was a brick-tiled cottage on a two-story floor with a wall thickness of 240 mm and a cement-stone finish with poor ventilation . As the wall of the operation room is directly connected to the ground floor of the second floor, the influence of vibration and solid sound transmission can not be effectively eliminated. Therefore,