黄河四库联调调水调沙试验成功1.2亿t泥沙入海

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:victor0901
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
继2002年黄河首次调水调沙试验之后,2003年汛期,黄河水利委员会进行了更大空间尺度的调水调沙试验,并获得成功,12d试验期内,通过四座干支流水库的科学调度,利用洪水输送泥沙1.207亿t. 调水调沙是解决黄河泥沙问题,实现黄河长治久安的重要举措之一,即通过骨干水库的调节,改变黄河“水少沙多,水沙时 Following the first trial of water and sediment adjustment in the Yellow River in 2002, the Yellow River Conservancy Commission conducted a larger scale water and sediment adjustment trial in the flood season of 2003 and was successful. During the 12d trial period, through the scientific dispatch of four dry tributary reservoirs, The use of flood transport sediment 120.7 million t. Water and sediment regulation is to solve the Yellow River sediment problem, to achieve long-term stability and the Yellow River one of the important measures, that is, through the backbone reservoir regulation, change the Yellow River "less water and less water and sediment
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
PDF/VT现已成为一个热门话题。简言之,它是一个专门用于描述基于PDF文件格式的标准,特别适用于可变数据印刷的作业交付。名称中的“VT”指的是“可变数据与票据”(VariableandTra
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1990年,美国麻省理工学院教授彼得.圣吉出版了《第五项修炼——学习型组织的艺术和实务》一书,提出了一种先进的组织形式,即学习型组织。所谓学习型组织是一种有机的、高度柔
运用中医的辨证论治,治疗尿石症取得满息的临床疗效,临床冶愈率达92%以上.
目的 回顾性分析早期鼻腔和韦氏环NK/T细胞淋巴瘤调强放疗(IMRT)的初步临床结果.方法 48例患者中42例为原发鼻腔NK/T细胞淋巴瘤,6例为韦氏环NK/T细胞淋巴瘤.根据Ann Arbor分期,I_E期37例,Ⅱ_E期11例.22例接受单纯放疗,26例接受放化疗.95%计划靶体积(PTV)处方剂量为50 Gy.放疗副反应分级采用RTOG标准.局部控制率和生存率用Kaplan-Meier法计算
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
南通大学附属医院是苏北规模最大的综合性“三级甲等”医院,在江苏省也是排名前列。2002年荣获“南通市模范职工之家”称号,2003年荣获“江苏省模范职工之家”称号,2005年荣