【摘 要】
:
前言天桥电站系一低水头径流电站,厂房为河床封闭式。装机四台,总容量12.8万千瓦。其中一、二号机组容量为2.8千瓦,水轮机为 ZZ105—LH—530型,发电机为 TS900/71—56型,调
论文部分内容阅读
前言天桥电站系一低水头径流电站,厂房为河床封闭式。装机四台,总容量12.8万千瓦。其中一、二号机组容量为2.8千瓦,水轮机为 ZZ105—LH—530型,发电机为 TS900/71—56型,调速器原为 E—10型电液调速器,设计中保留原机械柜,将电气柜改为 JRF—312型,油压装置容积8立米,工作压力20公斤/厘米~2;三、四号机组容量为3.6万千瓦,水轮机为 KVB37—18
Preface Tianqiao Power Station is a low-head runoff power station with closed-type riverbed. Installed four, the total capacity of 128,000 kilowatts. One, two units capacity of 2.8 kilowatts, turbine ZZ105-LH-530 type, the generator is TS900 / 71-56 type, governor was E-10-type electro-hydraulic governor, the original design to retain the machinery Cabinet, the electrical cabinet to JRF-312 type, hydraulic device volume of 8 cubic meters, the working pressure of 20 kg / cm ~ 2; third and fourth unit capacity of 36,000 kilowatts, turbine KVB37-18
其他文献
Based on their REE contents and REE patterns, eclogites from the ultra|high pressure metamorphic belt in central China may be roughly divided into six types inc
Multiple electrodes are arranged on the surfaces of cubic granite samples of different sizes according to pre-designed patterns. Smples are fully saturated wit
英语摘要的语言错误大部分表现在基本语法方面。英语句子的组成有严格的语法规则,阅读起来比较容易,一旦自己动笔写就容易出差错。医学摘要是长篇论文的缩影,是一项科学研究
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
近几年,河南、山东境内黄河险工坝岸(护岸下同)曾多处发生裂缝、滑坍、溃塌等险情,有些还发生在非汛期,这是第三次加
In recent years, there are many dangerous situatio
葛洲坝水利枢纽工程大江截流合龙的喜讯传到我院后,广大教师,特别是为葛洲坝工程作过科学研究和设计工作的同志,心情非常激动,他们为万里长江第一坝的截流胜利合龙感到高兴
笔者在1981年第1期发表“气力泵清淤装置”以来,有关单位和个人来函表示关注并给予指导,在此致以谢意。现就文中存在问题,作以补充和修正如下:第51页右栏倒数第3行含泥浓度3
黄河内蒙河段自然情况下冰期来水呈一退水趋势,流凌封河时河道流量多在400秒立米左右,故河槽蓄水较少。解冻开河时,槽蓄水量自上而下逐段释放加大汇成凌峰,故多呈武开河形势
与《星球大战》离婚加利福尼亚,尼卡西奥——我们在牧场上,是的。对。感觉它在你内心流淌。大门,道路,山丘,绿树,葡萄园。这些都是用星战电影赚得的第一笔钱在八十年代建立起