【摘 要】随着我国社会主义现代化建设的不断加快,各种工程项目建设越来越多,随之对工程质量高度关注。监理在工程建设中是一项非常关键的基础性工作,它贯穿整个工程建设之中,而其中质量的控制是工程监理的核心所在。本文对建设工程监理过程中的质量控制以及质量控制的主要方法进行简要论述分析,在工程中监理人员更好的运用质量控制方法。
【关键词】工程监理;质量控制;途径与方法
Discussion related to Quality Engineering Supervision ways and means of control
Song Ying-jun
(Zhejiang Zhiyuan Construction Consulting Supervision Co., Ltd Yiwu Zhejiang 322000)
【Abstract】With the speeding up of China's socialist modernization construction of various projects, more and more attention along with the quality of the project. In engineering construction supervision is a very critical infrastructure work, which runs through the entire project construction, quality control which is the core of project supervision. In this paper, the process of construction supervision and quality control of the main methods of quality control are discussed briefly analyzed in the project to better use of quality control methods supervisors.
【Key words】Project supervision;Quality control;Approaches and Methods
工程监理的主要任务就是采取有效的组织管理措施,对建设工程的投资、进度和质量等三大目标实施动态控制,确保三大目标得到合理的实现。在建设工程监理过程中,监理人员所采用的质量控制的方法多种多样,而旁站、巡视、平行检验作为工程监理的质量控制手段,必须针对工程特点及实施情况,在工程质量控制过程中其方法才能发挥有效的作用,它们有各自的工作目的和范畴,具有各自不同的作用。因此,抓好工程质量控制是重中之重,是监理工作的生命线,如何有效地实施工程监理工作,减少和避免安全事故的发生,进行工程监理质量控制,是当前监理行业研究的热点。
1. 工程监理质量控制的必要性
(1)近年来我国工程建设规模不断扩大,特别是与人们生活密切相关的建筑工程。工程质量作为工程建设的基础和核心,其质量不仅关系到企业的经济效益,而且关乎人们生命财产安全和社会的稳定和谐发展,因此工程质量问题一直是国家和社会关注的焦点。工程监理存在于工程前期准备阶段、施工阶段、竣工验收阶段整个过程中,加强工程监理旗量控制能有效的保证工程质量,促进社会的健康可持续发展。
(2)工程监理制度是指监理单位受项目法人的委托,依据国家批准的工程项目建设文件、有关工程建设的法律、法规和工程建设监理合同以及其他工程建设合同而对工程建设实施监督管理的制度。工程建设监理的中心任务就是控制工程项目目标,也就是控制经过科学的规划所确定的工程项目的投资、进度和质量目标,而其中质量的控制是工程监理的核心所在。工程监理中的质量控制是指为达到工程项目质量要求所采取的作业技术和活动。其质量要求主要表现为工程合同、设计文件、规范规定的质量标准。因此,工程监理中的质量控制是技术、经济和法律在工程施工质量上的统一体现,工程监理质量控制包括了事前控制、事中控制、事后控制三个阶段,即施工准备阶段的质量控制、施工阶段的质量控制、竣工验收阶段的质量控制,下面本文将详细这三个阶段具体的质量控制的方法和途径。
(3)近年来国家和相关企业加大工程监理建设取得了一定的工程监理质量控制在保证工程质量上有着至关重要的作成就,但是仍然存在一些问题:一是监理单位很难正常进行工作。目前我国监理市场还不是很完善,监理市场价格偏低,导致监理单位资金运转不顺,难以正常开展工作,不能充分发挥其监理作用。二是专业监理工程师较少,供不应求。目前我国注册监理工程师还不到该行业人数的30%,无法满足监理工程的专业化要求,监理整体质纛不是很高。三是建设单位“以质量换效益”现象严重存在。很多建设单位为了中标而压缩投标价格,在工程建设中为了获取经济效益,减少工序和工程量,造成质量隐患,同时很多施工单位在施工中存在偷工减料等问题,影响工程质量。四是“挂靠”现象较普遍。近年来国家加大“挂靠”现象打击力度,取得一定的成效,但还是有个别单位违反国家法规实行“挂靠”。
2. 工程监理中的质量控制的有效途径和方法
2.1 施工准备阶段的质量控制途径与方法。
在业主完成工程项目基本建设程序审批、组织协调占用土地、动迁拆迁等前期工作就绪及技术交底核实无误的基础上,监理工程师应主要利用以下途径和方法,以保证施工准备阶段的质量控制:监控准备工作。监理工程师首先要建立或完善的质量监控体系,使之能适应施工项目质量监控的需要,如设立质量自检机构,配备监控人员及所需的检测仪器设备并使之处于良好的可用状态,明确监控人员的职责和分工等。此外,还应督促与协助承包商建立健全现场管理制度。施工设施准备情况审核工作。要求监理工程师依据《合同文件》、《技术规范》,对承包商的施工组织设计、施工方案和劳力安排、设备、材料及其它施工设施的准备情况进行审核,审核的具体内容包括: 审查承包商的各项施工准备情况是否具备开工建设条件,以及牵涉到施工过程中的工序衔接时,是否经过监理工程师验收批复,以利于工程项目的施工进展顺利。施工材料准备情况审核工作。监理工程师应对承包单位报送的拟进场工程材料、构配件和设备的报审表,并附质量证明资料、进场质量检验记录审核签认,并对进场的实物按照委托监理合同约定或有关工程质量管理文件规定的比例,采用平行检验或见证取样方式进行抽检,对未经项目监理人员验收或验收不合格的工程材料、构配件、设备,项目监理人员应拒绝签认,并应签发监理工程师通知单,书面通知承包单位限期将不合格的工程材料、构配件、设备撤出现场。 2.2 严格把好施工阶段监理质量关。
对施工相关材料进行严格的审核。工程监理师要对施工设计图纸、施工技术、施工原材料和设备报审表等资料进行全面的审查,一方面保证各材料的质量,为施工做好准备,另一方面工程监理师可经由这些材料把握施工进度,从而采取相关措施进行监管,保证工程施工质量。做好施工现场监理工作。对进入施工现场的原材料、设备、施工环境、施工工艺等进行检查,一旦发现问题,要及时采取相关措施解决问题,保证其符合现场施工相关标准和要求。具体而言,对原材料、工序等检查主要方法有直接检测法(如目测法)、检验仪器设备法和试验法。同时要重点对施工难点和要点进行监管,在一道工序检验合格后方可进入下一道,保证施工质量。此外,对工程施工中比较容易忽视的工序、工序产品等进行检査,且可以与施工单位合作进行互检。
2.3 竣工验收阶段的质量控制途径与方法。
在工程的竣工验收阶段,监理单位在接到施工单位的报验申请后,在约定的时间内由专业监理工程师组织建设单位的专业技术负责人、施工单位的质量员等进行验收并对验收结果详细记录并及时确认。监理单位应根据工程完成情况,按国家标准《工程施工质量验收规范》的质量评定标准和办法,对完成的单元、分项、分部工程、单位工程进行检查验收。其中,对于单元工程质量合格的判定标准为: 主控项目的质量经抽样检验合格和一般项目的质量经抽样检验符合设计、规范要求; 具有完整的施工操作依据、质量检查记录。对于分项工程质量合格的判定标准为: 分项工程所含检验批的质量符合合格质量规定; 分项工程所含的检验批质量验收记录应完整。对于分部工程质量合格的判定标准为: 分部工程所含分项工程的质量均应验收合格; 质量控制资料应完整; 地基与基础、主体结构和设备安装等分部工程有关安全及功能的检验和抽样检测结果应符合有关规定。最后,还应针对工程质量和内业资料存在的问题,提出整改及时间要求,整改完毕签署工程竣工报验,在此基础上提出工程质量评估报告并报监理公司审核签认。
3. 结语
为促进监理单位在技术装备上和手段上的提高,使监理单位以市场需求为导向,向全方位、全过程发展,以及与国际惯例接轨,走向世界的目标,合理的调整现行监理收费标准势在必行。
参考文献
[1] 洪胜华. 工程监理质量控制途径与方法探析[J]. 经营管理者,2011,16:341.
[2] 赵忠贵. 谈工程监理质量控制方法的运用[J]. 科技资讯,2009,31:117+119.
[3] 张广雷,于向丽,杨东峰. 谈工程监理质量控制方法的运用[J]. 河南水利与南水北调,2010,08:205~206.
[4] 吴善强. 浅析工程监理中的质量控制[J]. 门窗,2013,10:259.
【关键词】工程监理;质量控制;途径与方法
Discussion related to Quality Engineering Supervision ways and means of control
Song Ying-jun
(Zhejiang Zhiyuan Construction Consulting Supervision Co., Ltd Yiwu Zhejiang 322000)
【Abstract】With the speeding up of China's socialist modernization construction of various projects, more and more attention along with the quality of the project. In engineering construction supervision is a very critical infrastructure work, which runs through the entire project construction, quality control which is the core of project supervision. In this paper, the process of construction supervision and quality control of the main methods of quality control are discussed briefly analyzed in the project to better use of quality control methods supervisors.
【Key words】Project supervision;Quality control;Approaches and Methods
工程监理的主要任务就是采取有效的组织管理措施,对建设工程的投资、进度和质量等三大目标实施动态控制,确保三大目标得到合理的实现。在建设工程监理过程中,监理人员所采用的质量控制的方法多种多样,而旁站、巡视、平行检验作为工程监理的质量控制手段,必须针对工程特点及实施情况,在工程质量控制过程中其方法才能发挥有效的作用,它们有各自的工作目的和范畴,具有各自不同的作用。因此,抓好工程质量控制是重中之重,是监理工作的生命线,如何有效地实施工程监理工作,减少和避免安全事故的发生,进行工程监理质量控制,是当前监理行业研究的热点。
1. 工程监理质量控制的必要性
(1)近年来我国工程建设规模不断扩大,特别是与人们生活密切相关的建筑工程。工程质量作为工程建设的基础和核心,其质量不仅关系到企业的经济效益,而且关乎人们生命财产安全和社会的稳定和谐发展,因此工程质量问题一直是国家和社会关注的焦点。工程监理存在于工程前期准备阶段、施工阶段、竣工验收阶段整个过程中,加强工程监理旗量控制能有效的保证工程质量,促进社会的健康可持续发展。
(2)工程监理制度是指监理单位受项目法人的委托,依据国家批准的工程项目建设文件、有关工程建设的法律、法规和工程建设监理合同以及其他工程建设合同而对工程建设实施监督管理的制度。工程建设监理的中心任务就是控制工程项目目标,也就是控制经过科学的规划所确定的工程项目的投资、进度和质量目标,而其中质量的控制是工程监理的核心所在。工程监理中的质量控制是指为达到工程项目质量要求所采取的作业技术和活动。其质量要求主要表现为工程合同、设计文件、规范规定的质量标准。因此,工程监理中的质量控制是技术、经济和法律在工程施工质量上的统一体现,工程监理质量控制包括了事前控制、事中控制、事后控制三个阶段,即施工准备阶段的质量控制、施工阶段的质量控制、竣工验收阶段的质量控制,下面本文将详细这三个阶段具体的质量控制的方法和途径。
(3)近年来国家和相关企业加大工程监理建设取得了一定的工程监理质量控制在保证工程质量上有着至关重要的作成就,但是仍然存在一些问题:一是监理单位很难正常进行工作。目前我国监理市场还不是很完善,监理市场价格偏低,导致监理单位资金运转不顺,难以正常开展工作,不能充分发挥其监理作用。二是专业监理工程师较少,供不应求。目前我国注册监理工程师还不到该行业人数的30%,无法满足监理工程的专业化要求,监理整体质纛不是很高。三是建设单位“以质量换效益”现象严重存在。很多建设单位为了中标而压缩投标价格,在工程建设中为了获取经济效益,减少工序和工程量,造成质量隐患,同时很多施工单位在施工中存在偷工减料等问题,影响工程质量。四是“挂靠”现象较普遍。近年来国家加大“挂靠”现象打击力度,取得一定的成效,但还是有个别单位违反国家法规实行“挂靠”。
2. 工程监理中的质量控制的有效途径和方法
2.1 施工准备阶段的质量控制途径与方法。
在业主完成工程项目基本建设程序审批、组织协调占用土地、动迁拆迁等前期工作就绪及技术交底核实无误的基础上,监理工程师应主要利用以下途径和方法,以保证施工准备阶段的质量控制:监控准备工作。监理工程师首先要建立或完善的质量监控体系,使之能适应施工项目质量监控的需要,如设立质量自检机构,配备监控人员及所需的检测仪器设备并使之处于良好的可用状态,明确监控人员的职责和分工等。此外,还应督促与协助承包商建立健全现场管理制度。施工设施准备情况审核工作。要求监理工程师依据《合同文件》、《技术规范》,对承包商的施工组织设计、施工方案和劳力安排、设备、材料及其它施工设施的准备情况进行审核,审核的具体内容包括: 审查承包商的各项施工准备情况是否具备开工建设条件,以及牵涉到施工过程中的工序衔接时,是否经过监理工程师验收批复,以利于工程项目的施工进展顺利。施工材料准备情况审核工作。监理工程师应对承包单位报送的拟进场工程材料、构配件和设备的报审表,并附质量证明资料、进场质量检验记录审核签认,并对进场的实物按照委托监理合同约定或有关工程质量管理文件规定的比例,采用平行检验或见证取样方式进行抽检,对未经项目监理人员验收或验收不合格的工程材料、构配件、设备,项目监理人员应拒绝签认,并应签发监理工程师通知单,书面通知承包单位限期将不合格的工程材料、构配件、设备撤出现场。 2.2 严格把好施工阶段监理质量关。
对施工相关材料进行严格的审核。工程监理师要对施工设计图纸、施工技术、施工原材料和设备报审表等资料进行全面的审查,一方面保证各材料的质量,为施工做好准备,另一方面工程监理师可经由这些材料把握施工进度,从而采取相关措施进行监管,保证工程施工质量。做好施工现场监理工作。对进入施工现场的原材料、设备、施工环境、施工工艺等进行检查,一旦发现问题,要及时采取相关措施解决问题,保证其符合现场施工相关标准和要求。具体而言,对原材料、工序等检查主要方法有直接检测法(如目测法)、检验仪器设备法和试验法。同时要重点对施工难点和要点进行监管,在一道工序检验合格后方可进入下一道,保证施工质量。此外,对工程施工中比较容易忽视的工序、工序产品等进行检査,且可以与施工单位合作进行互检。
2.3 竣工验收阶段的质量控制途径与方法。
在工程的竣工验收阶段,监理单位在接到施工单位的报验申请后,在约定的时间内由专业监理工程师组织建设单位的专业技术负责人、施工单位的质量员等进行验收并对验收结果详细记录并及时确认。监理单位应根据工程完成情况,按国家标准《工程施工质量验收规范》的质量评定标准和办法,对完成的单元、分项、分部工程、单位工程进行检查验收。其中,对于单元工程质量合格的判定标准为: 主控项目的质量经抽样检验合格和一般项目的质量经抽样检验符合设计、规范要求; 具有完整的施工操作依据、质量检查记录。对于分项工程质量合格的判定标准为: 分项工程所含检验批的质量符合合格质量规定; 分项工程所含的检验批质量验收记录应完整。对于分部工程质量合格的判定标准为: 分部工程所含分项工程的质量均应验收合格; 质量控制资料应完整; 地基与基础、主体结构和设备安装等分部工程有关安全及功能的检验和抽样检测结果应符合有关规定。最后,还应针对工程质量和内业资料存在的问题,提出整改及时间要求,整改完毕签署工程竣工报验,在此基础上提出工程质量评估报告并报监理公司审核签认。
3. 结语
为促进监理单位在技术装备上和手段上的提高,使监理单位以市场需求为导向,向全方位、全过程发展,以及与国际惯例接轨,走向世界的目标,合理的调整现行监理收费标准势在必行。
参考文献
[1] 洪胜华. 工程监理质量控制途径与方法探析[J]. 经营管理者,2011,16:341.
[2] 赵忠贵. 谈工程监理质量控制方法的运用[J]. 科技资讯,2009,31:117+119.
[3] 张广雷,于向丽,杨东峰. 谈工程监理质量控制方法的运用[J]. 河南水利与南水北调,2010,08:205~206.
[4] 吴善强. 浅析工程监理中的质量控制[J]. 门窗,2013,10:259.