桐柏抽蓄电站在施工过程中高度重视水土保持工作,高标准严要求,根据不同工程的水土流失特点采取适合的工程和植物措施,各项水土保持工程指标均达到和超过有关规范标准的要求,并获得了省级水土保持示范工程荣誉。特别是在岩面边坡治理方面进行了探索,获得了不同坡度岩面边坡的防治经验,在同类项目中具有一定的推广价值。
Tongbai Pumped Storage Power Station attaches great importance to soil and water conservation work in the construction process, with high standards and strict requirements. According to the characteristics of soil and water loss in different projects, appropriate engineering and plant measures are taken and all the soil and water conservation engineering indicators meet and exceed the requirements of the relevant normative standards , And won the honor of provincial soil and water conservation demonstration project. In particular, exploration on rock face slope management has been carried out, and experience of prevention and treatment of slope face with different gradient has been obtained, which has certain promotion value in similar projects.