升板法是国外在居住和公共建筑施工中所采用的一种方法。基本原理是在施工现场就地重叠浇筑建筑物屋盖和楼板。立好柱子后,以柱子为导架,用千斤顶把楼板和屋盖板提升到设计高度加以固定。这个原理早在1913年由美国学者提出,由于没有很好解决带梁楼板的重叠生产方法和板柱结合方法,升板法长期得不到实用。直到1948年,美国建筑师菲利普·N·尤兹和托马斯·B·施利柯才把升板法用于实践,1950年建成了第一幢升板法建筑。
The board lift method is a method used abroad in the construction of residential and public buildings. The basic principle is to superimpose and pour the building roofs and floors on the construction site. After the pillars were erected, the pillars were used as the guide frames, and the jacks and the roof panels were lifted to the designed height and fixed with jacks. This principle was proposed by American scholars as early as 1913. Because there is no good solution to the overlapping production method of beamed floor slabs and the combination method of slabs and columns, the slab lifting method has not been practical for a long time. Until 1948, the American architects Philip N. Youz and Thomas B. Schleke used the lifting plate method to practice. In 1950, they built the first building method.