Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m. The steel box girder of main span includes five portions: back span l
An attitude control algorithm for reusable launch vehicle (RLV) in reentry phase is proposed based on sliding mode variable structure control technique. The aer