论文部分内容阅读
四川开县电力公司为了解决开县电厂(火电)粉煤灰综合利用问题,直接把粉煤灰砖厂纳入公司下属,与电厂是“兄弟”单位的位置,不但以3个多月惊人的速度建成粉煤灰砖厂,而且产品在半年的试生产中就迅速占领市场,拿到地区质检部门的合格证,盈利6万多元.在开发粉煤灰新型建材方面,真正做到了“排用一体”,解决了其他地方反映出来的粉煤灰综合利用的诸多矛盾.1 砖厂设计建设均由公司承担通过有关领导和工程技术人员对外地砖厂的充分考察,由主管基建的副经理挂帅,领导公司生
In order to solve the comprehensive utilization of fly ash in Kaixian Power Plant (coal power), Sichuan Kaixian Electric Power Company directly incorporated fly ash brick plant into the company’s subordinates, and the power plant was the location of the “brother” unit, not only building powder at an amazing speed for more than three months. Ash brick factory, and the product in the six months of trial production quickly occupied the market, get the certificate of regional quality inspection department, profit more than 60,000 yuan. In the development of new types of fly ash building materials, truly “distribution with one ”Solving the contradictions in the comprehensive utilization of fly ash reflected in other places. 1 The design and construction of brick plants are all undertaken by the company through relevant leaders and engineering technicians to fully inspect the foreign brick factories, and the deputy managers in charge of infrastructure are in charge. Company student