论文部分内容阅读
一、問题的提出我国現阶段在河流規划,水利樞紐的各个設計阶段上,都已經比較广泛地应用了数学統計法来解决水庫的多年調节問題。但是如何应用数学統計方法来解决水庫年調节計算的問題,至今尚无簡捷的方法。这是因为一般雨源河流洪水季与枯水季比較不稳定,即河流每年徑流的年内分配虽然有一定規律可循,但并不能使得每年的洪、枯水季时段都相同。因此在进行
First, the issue raised At this stage in our country in the river planning, water conservancy hub design stages, have been more widely applied mathematical statistics to solve the problem of multi-year reservoir regulation. However, there is no easy way to solve the problem of annual adjustment of reservoir by applying mathematical statistics method. This is because the general flood season of the Yuyuan River is relatively unstable with the dry season. That is, although the annual distribution of the annual runoff of the river has some rules to follow, it does not make the annual flood and dry season the same. So in progress