论文部分内容阅读
我国最大的第一座双向潮汐试验电站——浙江省温岭县江厦潮汐试验电站自1980年5月4日第一台机组投入运行以来,接着1985年又有4台机组投入运行。该电站被列为国家“六、五”期间重点科技攻关项目,电站总共装机六台,总容量为3900kW,目前电站共装有五台我国自行设计和制造并且有双向发电及泄水等多功能的灯泡惯流式水轮发电机组,总容量为3200kW,机组分二种机型:直联型和齿轮增速型。电站的单机容量或是总装机容量仅次于法国朗斯电站和加拿大安娜波立斯电站。通过机组的试验运行,主要研究潮汐能的开发利用和可能性,研制合理可靠的机型结构,海水对机组、建筑物的腐蚀情况和防腐防污的措施,正、
The first bi-directional tidal test power station in China, the Jiangxia Tidal Power Station in Wenling County, Zhejiang Province, was put into operation on May 4, 1980, and then another four units were put into operation in 1985. The power station has been classified as national “six, five” key scientific and technological projects during the project, a total of six installed power station, with a total capacity of 3900kW, the current total of five power stations installed in our own design and manufacture and there are two-way power generation and drainage and other multi-function Of the bulb-type hydro-generating units, with a total capacity of 3200kW, the unit is divided into two types: direct-coupled and gear growth type. The stand-alone or total installed capacity of the power station is second only to France’s Rons power station and Canada’s Annapolis power station. Through the trial operation of the unit, the main research on the development and utilization of tidal energy and the possibility of developing a reasonable and reliable model structure, seawater on the unit, building corrosion and anti-pollution measures, positive,