铁路旅客运输提高运能压缩停站时间后,中间站客车上水时间减少,车上用水无法满足旅客用水要求。为改变旅客列车用水现状,提高旅客列车给水站给水设备能力,通过分析将车上DN25 mm上水管道改为DN32 mm,以管径扩大前后、压力与流量的变化,对上水情况进行了分析,并以武昌、汉口旅客列车给水站工程改造与客车注水管道改造进行了对比,分析改变客车给水装置上水管道管径对节能和工程造价的影响,对修改标准、改造现有车辆给水装置等方面提出了相关对策。
Railway passenger transport capacity to improve compressibility stop time, the middle station bus to reduce the water time, the car water can not meet the passenger water requirements. In order to change the status quo of passenger train water supply and improve the capacity of water supply equipment of passenger train water supply station, the situation of Sheung Shui was analyzed by analyzing the change of DN 25 mm on-going water pipe to DN32 mm and the change of pressure and flow before and after the expansion of pipe diameter , And the contrastive analysis is made between the reconstruction of Wujiang and Hankou passenger train water supply stations and the refueling pipelines of passenger cars. The influence of changing the pipe diameter of the bus watering pipes on energy saving and project cost is analyzed. Relevant countermeasures are put forward.