藏中联网工程是继青藏联网、川藏联网工程之后,世界上海拔最高、海拔跨度最大、自然条件最复杂的输变电工程,是国家电网公司落实西部大开发战略,优化能源资源配置,服务西藏全面建成小康社会的德政工程、民心工程、战略工程。由国网甘肃送变电工程公司承建的藏中联网工程第5标段位于西藏芒康县和左贡县间的东达山上,是全线海拔最高的一个标段,平均海拔4617米,线路全长75.9公里,铁塔162基,
After the project of connecting the Qinghai-Tibet network and Sichuan-Tibet network, the Tibet-Tibet networking project is the largest in the world with the highest elevation and the most complicated natural conditions. It is a strategic plan for the State Grid Corporation of China to implement the strategy of developing the western region, optimize the allocation of energy resources and services Tibet’s construction of a well-to-do society in an all-round manner is a project of ethics, popular project and strategic project. Substation 5 of the Tibet-China interconnection project, which was constructed by Gansu Power Transmission and Transformation Engineering Corporation, is located on Dongda Mountain between Mangkang County and Zogang County of Tibet. It is the highest elevation section of the entire railway line with an average elevation of 4617 meters and the entire line 75.9 km long, tower 162 base,