从河南的渑池到山西的中条山的胡家峪,一条长达102公里(包括支线)的11万伏高压输电线路已经建成。这条线路的高速建设又充分显示出党指示的作一切工作都必须走群众路线这一真理的光辉。渑中线的前身是三中线(从三门峡到中条山),是在第一个五年计划末设计的。1958年冬,山西省电力厅基建局曾派人进行了调查,发现这条线施工条件很差,沿路几乎都是断崖峭壁和大森林。初步估计,动员一两千人施工也得两年时间,仅修路一项最少也得37万多个工日。
From Huachi in Henan Province to Hujiayu in Zhongtiaoshan in Shanxi Province, a 110-kilovolt high-voltage power transmission line with a length of 102 kilometers (including extension lines) has been completed. The rapid construction of this route fully demonstrates the glorious truth of the truth that the party must follow the instructions of the masses and must follow the mass line. The predecessor of the middle line was the Third Central Line (from Sanmenxia to Zhongtiaoshan), which was designed at the end of the first five-year plan. In the winter of 1958, an investigation was conducted by the Infrastructure Bureau of Shanxi Electricity Power Bureau and found that the construction conditions of this line were very poor. Most of the roads were steep cliffs and big forests. According to preliminary estimates, it will take two years to mobilize one or two thousand people to construct a road, and at least 370,000 man-days must be repaired.