去年,遭遇特大洪灾肆虐的汉川民乐闸,因闸门撕裂,险些酿成惨祸。今年,孝感市审计局在对该闸整险加固工程款项进行审计时,发现该项目,优化质量管理,各项技术指标均达到国家标准。(题图为整险加固后的闸排水河床)一、制定严格的质量保证措施。一是把好原材料进场关,建立严格的原材料、成品、半成品出厂合格证制度、技术检验制度、技术交底制度和不合格原材料退货制度;二是把好尺寸关、
Last year, the Hanchuan folk music gate, which was hit by a particularly big flood, almost caused a tragedy because of a torn gate. This year, Xiaogan City Audit Bureau in the gates of the entire risk and reinforcement project audit, found that the project, optimize the quality of management, the technical indicators have reached the national standard. (The picture shows the whole river gate after the flood reinforcement) First, the development of strict quality assurance measures. First, the good raw materials into the customs, the establishment of strict raw materials, finished products, semi-finished products factory certificate system, technical inspection system, technical delivery system and substandard raw materials return system; the second is to close the size,