水平槽整地——荒山坡面治理的新形式

来源 :中国水利 | 被引量 : 0次 | 上传用户:renbai
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
辽宁省兴城市从1990年开始,治理荒山引进了水平槽整地形式,并且很快被山区广大干部群众所接受,使其成为荒坡治理的主要模式。以往的坡面工程形式如水平阶、水平沟、台、坑、穴等对于治理土层很薄的石质山区效果不够理想,新引进的水平槽整地措施,就是在整面荒坡上,沿等高线每隔2~3米布设一行水平槽(2.5×1.2×0.3米)以保水,槽底再挖一道换土沟(2.5×0.6×0.3米)以种树;沿每行 Since 1990, Xingcheng City, Liaoning Province, has introduced the horizontal trough land preparation form for the management of barren hills, and was quickly accepted by the vast cadres and masses in the mountainous areas, making it the main mode of harnessing the slopes. The previous slope engineering forms such as horizontal steps, horizontal ditches, stations, pits, holes and the like are not ideal for controlling the effect of the stony mountainous area where the soil layer is very thin. The newly introduced horizontal trenching site preparation measures are on the entire barren slope, A horizontal line (2.5 × 1.2 × 0.3m) shall be laid out every 2 ~ 3 meters to save water. A trench exchange (2.5 × 0.6 × 0.3m)
其他文献
为了解穗条节数、IBA和NAA对萝芙木(Rauvolfia verticillata)扦插生根率的影响,采用L12(3×24)正交试验设计对穗条节数为1、2、3节,IBA浓度为0.5和0.75g/L,叶面喷施0.1g/L的N
目的 探讨全反式维甲(ATRA)诱导HL-60细胞分化过程中人类端粒酶逆转录酶(hTERT)蛋白表达和端粒酶活性的改变。 方法 应用间接免疫荧光标记法通过流式细胞仪检测hTERT蛋白含量
山东黄河滩区总面积1310km~2,居住人口60余万,耕地9万余公顷,其中滩区内人口占有耕地5万余公顷,人均耕地0.09公顷,其余耕地为跨堤村在背河居住人口占有。党的十一届三中全会
高加索谢维尔罗姆河上的大型钦尔喀斯水力发电厂,按电网系统调度要求在调节潮流负荷中起着重要作用,並且还承担着局部尖峰负荷。於是钦尔喀斯水力发电厂只能在峰值工况下运
东南亚金融危机把亚洲相当一部分国家,特别是过去经济发展较快、市场发展前景一直被看好的亚洲新兴工业国家和地区席卷其中,不但对亚洲经济的发展,而且对包括美国、欧洲、拉美国
江西省宜春市水利电力局孟宪呈工程师,总结几十年的实践经验设计的XW-500型分层放水启闭机,安装在慈化乡山坑水库的输水卧管上,今年4月2日正式启用,运行情况良好。该启闭机
本文依据对B公司以往的新建、改造项目现场验收审计经验,分析影响项目预期效益实现的内控运行效率因素,总结归纳项目投资内部控制关键环节、流程缺失,将与项目有关的各项制度
1992年7月16~18日,水利水电规划设计总院在长春市召开了《全国可能最大暴雨(PMP)经验交流会》.参加会议的有各流域机构及设计院、南京水文水资研究所、部属设计院、部分省(区
世界闻名的雅砻江二滩水电站现在正式开工兴建了。这是全国人民和水力发电界久已盼望的事。二滩水电站装机容量330万kW,年发电量170亿kW·h;坝高240m,是国内最高的混凝土双
1991年10月,我院与能源部签订了“八五”国家重点科技攻关三项专题合同:1.“高强度大体积混凝土材料特性研究”。结合二滩拱坝施工设计,研究大体积混凝土的力学、热学、耐久