Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectri

来源 :Science in China(Series E:Technological Sciences) | 被引量 : 0次 | 上传用户:chen009123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
To solve the engineering and scientific problems in construction diversion and its simulation analysis, a complete scheme is presented. Firstly, the complex constraint relationship was analyzed among main buildings, diversion buildings and flow control. Secondly, the time-space relationship model of construction diversion system and the general block diagram-oriented simulation model of diversion process were set up. Then, the corresponding numerical simulation method and 3D dynamic visual simulation method were put forward. Further, the simulation and optimization platform of construction diversion control process was developed, integrated with simulation modeling, computation and visualization. Finally, these methods were applied to a practical project successfully, showing that the modeling process is convenient, the computation and the visual analysis can be coupled effectively, and the results conform to practical state. They provide new theoretical principles and technical measures for analyzing the control problems encountered in construction diversion of hydraulic and hydroelectric engineering under complex conditions. Firstly, the complex constraint relationship was seen among construction buildings, diversion buildings and flow control. Secondly, the time-space relationship model of construction diversion system and the general block diagram-oriented simulation model of diversion process were set up. Then, the corresponding numerical simulation method and 3D dynamic visual simulation method were put forward. Further, the simulation and optimization platform of construction diversion control process was developed, integrated with simulation modeling, computation and visualization. Finally, these methods were applied to a practical project successfully, showing that the modeling process is convenient, the computation and the visual analysis can be coupled effectively, and the results conform to practical state. They provide new theoretical principles and technical measur es for analyzing the control problems encountered in construction diversion of hydraulic and hydroelectric engineering under complex conditions.
其他文献
目的:探讨青钱柳多糖对大鼠心肌缺血再灌注损伤(MIRI)的保护作用。方法:将50只Wistar大鼠随机分为5组,即假手术组、对照组、青钱柳多糖低剂量组(100 mg·kg-1)、青钱柳多糖中
本文论述了高等院校图书馆开展社区信息服务的必要性 ,分析了其开展社区信息服务的基础 ,并对高校图书馆怎样开展社区信息服务进行了具体探讨。
目的:观察真武汤对心力衰竭大鼠血清ST2及IL-33的影响,并探讨其作用机制。方法:以80只健康雄性Wistar大鼠为研究对象,除空白组10只外,其余70只通过冠脉结扎手术,术后结合冷水
你一定听过欢快舒畅的《快乐老家》,动人心扉的《等你爱我》,又或许你听过她更多的歌曲,她是陈明——一个沉寂多年,但让我们依旧沉醉迷恋的歌手。时光荏苒,再次出现在大众的
前言她是旧西藏农奴的女儿,社会的变革让爱唱歌的她登上了音乐的殿堂,从此她唱响了《毛主席的光辉》、《翻身农奴把歌唱》、《北京的金山上》、《唱支山歌给党听》、《一个妈
水利水电工程施工是一项庞大而复杂的系统工程,搞好工程项目管理是水利水电施工企业追求经济效益最大化的重要途径。工程项目管理是施工企业对所实施的工程项目进行全过程、
目的:优化红花减压辅助提取的工艺参数,为该工艺的推广与应用提供参考。方法:以羟基红花黄色素A得率为指标,采用响应面分析法对乙醇体积分数、沸腾温度、提取次数、提取时间
目的探讨儿童病毒性脑炎的临床表现、治疗方法及预后。方法回顾性分析89例病毒性脑炎患儿的临床资料。结果 89例病毒性脑炎患儿以发热、头痛、呕吐为主要临床表现,脑脊液检查
2000年以来,安徽省城镇化进入持续快速发展阶段,城镇化率由2000年的28%提高到2011年的44.8%,年均提高1.55个百分点,城镇人口由2001年的1795万人增加到2011年的2673万人。据预
本文通过采用结构式向量自回归(SVAR)模型,引入3个反映财政政策和通过膨胀的变量,建立相应的联立方程,对财政政策和通货膨胀传导机制进行研究。结果表明:2003年至今,财政政策