论文部分内容阅读
我矿主提升机为 XKT2×2.5×1.2—20型绞车,提升深度320m,采用双层缠绕。为了解决钢丝绳由下层转到上层的临界段的咬绳损坏情况,我们根据有关资料在临界段处装设了由
My mine hoist is XKT2 × 2.5 × 1.2-20 type winch, lifting depth 320m, using double winding. In order to solve the wire rope from the lower into the upper critical section of the bite rope damage, according to the relevant information in the critical section of the installed by the