我公司主要任务是搞上下水道的修建。我們負責施工的工程,除有特殊要求的以外,按規定一般都要绘制竣工图。具体做法是:工程完工以后,由施工人員根据施工中的記录、草图、变更設計的洽商材料等,一般繪制竣工图四份(如与原設計变动不大时,即用原設計图紙修改),經工地、公司有关技术部門逐級审核后,分送主管局或甲方、管理部門、設計部門等,并存档一份备查。与竣工图同时报送的还有文字总結,其內容主要是說明工程概况、施工技术和施工管理方面的情况、問題、质量情况等等。这些图紙和文字說明,反映了工程完工后的真实面貌,是工程維修管理上不可缺少的依据,其质量的好坏,是否准确与完整,直接影响着今后的工作。如我們自己修建的一幢办公楼,1960年发生了地下管道堵塞,厕所污水倒流,我們就利用竣工图順利地找到了地下管道的位置,及时进行了修理。又如我們施工的御河下水工程,由于基础部分改变了設計,但沒有在竣工图
My company’s main task is to engage in the construction of sewers. We are responsible for the construction of the project, unless there are special requirements, according to the provisions of the general plans should be drawn as completed. The specific approach is: After the completion of the project, the construction staff according to the construction of the records, sketches, change the design of the negotiated materials, the general drawing of the completion of Figure 4 (such as the original design changes, such as the original design drawings to modify ), The site, the company’s technical department level audit, the distribution Office or Party A, management, design department, and keep a record for future reference. At the same time with the completion of the report submitted text summaries, the main content is to explain the project overview, construction technology and construction management aspects, problems, quality and so on. These drawings and textual descriptions reflect the real appearance after the completion of the project and are an indispensable basis for the maintenance and management of the project. Whether its quality is good or not, whether it is accurate and complete and has a direct impact on future work will be reflected in these drawings and written descriptions. As an office building built by us, in 1960 there was a blockage of the underground pipelines and the restroom wasted. We used the as-built drawings to find the location of the underground pipelines and repaired them in time. Another example is the construction of the Royal River project, due to the basic part of the design change, but not in the completion of plans