论文部分内容阅读
裝配式水塔是新结构、新技术,质量要求较高的建筑物,是由钢筋混凝土网状支架和钢鈑制水槽、中心竖管等预制构件拼装而成,既符合“三化”又符合多快好省的建设方针。为此,我局把已设计完即将施工的山海关(120t×44m)、锦西(200t×20m)两处的钢筋混凝土整体式水塔改为装配式水塔。装配式水塔的施工在我局还是首次,特别是对扇形拱底,和大小锥底的加工以及水槽的吊装和焊接等都没有经验,通过三结合方法共同研究,先做模型后制工艺规程,把可能出现的问题都解决在着手之前,从而保证了工程顺利进展。为了作到好字当头质量第一,除制订工艺规程、施工措施外,并结合各段施工技术特长采取分工合作的办
Assembled water tower is a new structure, new technology, high-quality buildings, is composed of reinforced concrete mesh support and steel sheet metal sink, central standpipe and other prefabricated components assembled, both in line with the “three of” and in line with more Quick and easy province’s building guidelines. To this end, the Bureau has changed the reinforced concrete monolithic towers at both the Shanhaiguan (120t × 44m) and Jinxi (200t × 20m), which have already been designed and finished construction, to fabricated towers. Assembled water tower construction in our bureau for the first time, especially for the fan-shaped arch, and the bottom of the cone processing and sinking and welding and so on have no experience, through the three joint methods of joint research, first make the model process rules, The problems that may arise are solved before proceeding, thus ensuring the smooth progress of the project. In order to make good word quality first, in addition to formulate procedures, construction measures, combined with the various sections of the construction technology to take advantage of the division of labor