论文部分内容阅读
采用条桩式地下连续墙加锚杆联合支护方案 ,既保证了基坑支护的稳定和安全 ,又减小了成墙的技术难度
Adopting the method of combined support of anchoring rods and rods with underground continuous walls to ensure the stability and safety of foundation pit support and reduce the technical difficulty of wall construction