论文部分内容阅读
1设施运行维护根据反应堆安全停闭期特点,严格执行《重水研究堆安全关闭期运行维护、监测规程》和有关规程,维护反应堆系统、设备,保持系统的可用性和可靠性。反应堆维护期间,巡视、检查系统和设备的工作状态,未发生异常事件。1.1检修根据2012年检修计划完成以下内容:检查氦气系统、重水净化系统阀门、管道;维护201房
1 Facilities Operation and Maintenance According to the characteristics of the safe shutdown period of the reactor, the “Operation, Maintenance and Monitoring Procedures for the Safe Shut-off Period of Heavy Water Research Reactor” and the relevant regulations shall be strictly implemented to maintain the availability and reliability of the reactor system and equipment. During the maintenance of the reactor, inspection was conducted to check the working status of the system and the equipment, and no abnormal event occurred. 1.1 Maintenance According to the 2012 maintenance plan to complete the following: Check the helium system, heavy water purification system valves, pipes; maintenance of 201 rooms